A 160 acre ALTA / ACSM survey showing all improvements and observable utilities on the property. GPS and conventional surveying methods were used to produce this survey. Notice that land corners literally miles outside the project were located to insure the accuracy of this aliquot part boundary.
A “green field” or raw land survey for a new telecommunications tower site. Note the three “legs” extending from the center of the site. Dependent upon topography, field calculations are made to determine the location of the anchors for this proposed Guided Tower.
An approximately 3-mile pipeline route survey. This project required accurate location of improvements and property lines along the route as well as six ALTA / ACSM Surveys for right of way acquisition. Permanent controls were left in place for use in the design profile stages of the project. Strict time restraints were a primary issue on this project and Global Surveying Consultants was able to deliver all of the work in a 3-week period.